Project snapshot: a UK manufacturer of recycling and material sorting equipment needed a stainless steel fabrication partner for 316L hoppers, guards and control enclosures. Over 14 months the project moved from a single trial order to a quarterly release schedule, with lead time reduced by 35% and first-pass yield raised from 88% to 98.5%.
Client Background
ItemDetail
IndustryRecycling and material sorting equipment
LocationUnited Kingdom
Company sizeMid-sized OEM, 120 to 150 staff
Parts in scope316L hoppers, side guards, control cabinets, mounting frames
Annual volumeAround 2400 fabricated assemblies
Service usedOEM sheet metal fabrication, welding, powder coating, kitting
The Problem
The client had been buying fabricated 316L parts from a local UK subcontractor. Three issues kept repeating. First, delivery slipped: quoted at 8 weeks, actual delivery ran to 12 weeks in peak season, which pushed machine assembly dates and forced expensive overtime. Second, weld quality was inconsistent. Hoppers that must hold liquid were failing leak tests on roughly one unit in eight, and rework had to be done after powder coating, which meant stripping, re-welding and recoating. Third, dimensional drift appeared on multi-part assemblies: brackets that passed inspection individually would not line up on the assembly line, because each part had been made from a different drawing revision.
Cost per part looked acceptable on paper, but the true cost including rework, line stoppage and air freight for urgent replacement parts was far higher than the purchase price suggested.
What We Changed
Drawing and revision control: one master drawing set was locked at project start, and every batch was produced against the same revision with a revision stamp on each part
Welding fixtures: jigs were built for the three highest-volume weldments so hoop distortion stayed within 1.5mm and leak tests became repeatable
First article approval: a full first article with CMM dimensional report and weld photographs was approved before any batch production
Material traceability: 316L mill certificates were filed per heat number and referenced on the packing list
Kitting: parts for one machine were packed and labelled as a kit rather than as bulk quantities, cutting line-side sorting time
Surface treatment: powder coating applied after all welding and leak testing, with 480-hour salt spray verification on test coupons
Execution Timeline
Week 1: drawing review, DFM report issued with 11 cost and quality suggestions
Week 2: quotation approved, NDA signed, welding jigs designed
Week 3 to 4: first articles produced and shipped by air for approval
Week 5: client engineering sign-off, minor bend radius change incorporated
Week 6 onwards: batch production in 3-week cycles, sea freight with 2 weeks buffer stock at client site
Results After 14 Months
MetricBeforeAfter
Average lead time12 weeks7.5 weeks
First-pass yield88%98.5%
Leak test failures per batch12 unitsFewer than 1 unit
Rework and recoating costBaselineDown 42%
Emergency air freight events5 per year0 in 14 months
Assembly fit-up complaintsRecurringNone since batch 2
Client Feedback
"The difference is predictability. We stopped building buffer stock to protect our assembly line, because the parts arrive when promised and they fit the first time," said the client's purchasing manager. "The DFM notes in the first quote paid for themselves in the first three batches."
Why The Project Worked
Three things made the difference: fixtures instead of skill-dependent welding, one locked drawing revision across every batch, and inspection data shipped with the parts so the client could verify rather than guess, and a single English speaking engineer accountable for the account.
Similar Project?
We fabricate 304 and 316L parts for recycling equipment, food machinery, medical housings and water treatment systems. Send your drawing with material, thickness, finish and annual quantity, and our engineering team will reply with a costed quotation and DFM notes within 12 working hours.
Solusi kami. Solusi kami.
✨ Kami menyediakan layanan pembuatan lembaran logam stainless steel dari ujung ke ujung untuk membantu pelanggan memecahkan tantangan dalam presisi, kualitas, dan pengiriman.
✅ Solusi Utama
Custom Fabrication. Pengolahan khusus.Bagian logam lembaran stainless steel yang dibuat khusus berdasarkan gambar atau sampel.根据图纸或样品定制不?? 钢?? 金零部件. 根据图纸或样品定制不?? 钢?? 金零部件. 根据图纸或样品定制不?? 钢?? 金零部件. 根据图纸或样品定制不?? 钢?? 金零部件.
Keakuratan & Kontrol Kualitas. Keakuratan & Kontrol KualitasPengelolaan toleransi yang ketat dan inspeksi 100% sebelum pengiriman.严格公差管理, pengiriman 100% pemeriksaan.
Produksi Fleksibel.Dari prototipe untuk pesanan skala besar, kami beradaptasi dengan kebutuhan Anda.Dari sampel, produksi kecil hingga produksi besar dapat didukung.
Waktu Pengiriman Cepat.Prototyping yang cepat dan produksi yang efisien untuk memenuhi jadwal yang mendesak.快打样,高效生产,满足紧急交交期. 快打样,高效生产,满足紧急交交期. 快打样,高效生产,满足紧急交交期.
Satu-Stop Service. Satu-Stop ServiceDukungan desain, pemotongan laser, lentur, las, finishing permukaan, dan perakitan.提供设计支持,激光切割,折??,接??, surface processing hingga total assembling seluruh proses layanan.
Sebagai produsen fabrikasi lembaran logam baja tahan karat profesional, kami menyediakan layanan pemrosesan end-to-end untuk penutup peralatan yang disesuaikan. Mulai dari bahan lembaran mentah hingga produk yang sepenuhnya dirakit dan selesai, setiap langkah diselesaikan dengan presisi untuk memenuhi standar kualitas internasional. Di bawah ini adalah alur kerja tipikal untuk memproduksi rumah peralatan baja tahan karat:
1. Pemilihan & Pemotongan Material
Kami mulai dengan memilih lembaran baja tahan karat berkualitas tinggi (seperti SS304 atau SS316). Berdasarkan gambar pelanggan, material diproses menggunakan pemotongan laser, pengguntingan CNC, atau pengepresan untuk mencapai dimensi yang akurat dan tepi yang bersih.
2. Pembengkokan & Pembentukan
Bagian yang dipotong dibentuk menggunakan rem tekan CNC untuk memastikan sudut pembengkokan yang presisi dan kontrol toleransi yang konsisten. Bentuk kompleks dapat dicapai melalui proses pembengkokan atau penggulungan multi-langkah.
3. Pemesinan CNC & Pemrosesan Sekunder
Untuk komponen yang membutuhkan akurasi lebih tinggi atau fitur khusus, kami melakukan penggilingan CNC, penyadapan, pengeboran countersinking, dan pengeboran untuk memenuhi persyaratan fungsional yang terperinci.
4. Pengelasan & Perakitan
Kami menggunakan pengelasan TIG, pengelasan MIG, pengelasan spot, atau pengelasan stud untuk menggabungkan bagian sesuai dengan kebutuhan struktural. Setelah pengelasan, komponen dirakit untuk memverifikasi kecocokan dan stabilitas.
5. Perawatan Permukaan
Untuk meningkatkan penampilan dan daya tahan, kami menawarkan beberapa opsi finishing, termasuk:
Penggilingan dan pemolesan
Penyikatan
Pengeblasan pasir
Pelapisan pasivasi atau anti-sidik jari
Perawatan ini meningkatkan ketahanan korosi dan mencapai efek visual yang diperlukan.
6. Inspeksi Kualitas
Setiap bagian menjalani inspeksi dimensi yang ketat, pemeriksaan kualitas las, dan pengujian fungsional. Tim kualitas kami memastikan semua komponen memenuhi spesifikasi pelanggan dan standar internasional sebelum pengemasan.
7. Pengemasan & Pengiriman Akhir
Penutup yang sudah selesai dibersihkan, dilindungi dengan film/busa, dan dikemas dengan aman untuk diekspor guna memastikan pengiriman yang aman kepada pelanggan global.
Kami menawarkan pemotongan layanan uji per permintaan dan klien dapat online menonton seluruh proses
Bebas Kekhawatiran Setelah Penjualan
Kami memiliki mesin demo khusus dan tim untuk mendukung instalasi mesin & panduan operator mesin jika ada kebingungan klien memiliki
Menawarkan layanan yang Disesuaikan
Warna, logo & ukuran mesin dapat disesuaikan sesuai permintaan
Sumber Daya yang Dapat Dipercaya Dapat Dibagikan
Kami telah mengumpulkan sumber daya yang dapat diandalkan yang kaya pada peralatan Granulator, Peralatan Pembersih, Baler, Bahan Pembeli & Penjual, yang dapat kami bagikan dengan klien jika mereka memiliki permintaan